TESTING REPORT Title: Building Testing and
Monitoring at the Habitat/SIPA/APA Project in Plains, GA Author: Armin Rudd Purpose: Air tightness testing
of two structural insulated panel houses and a conventional wood
frame house. Executive Summary: On 18-19 February 1998, two structural insulated panel (SIP) houses and one conventional 2x4 wood frame house were tested. The houses were all single-story, slab-on-grade, and similar in size (average 1100 ft2). They were constructed by the Sumter County Habitat for Humanity Affiliate, with some assistance on the SIP houses from the Structural Insulated Panel Association. For the wood frame house, all construction and energy related details remained as standard practice for the Habitat Affiliate. While all three houses showed good performance for building envelope and duct system airtightness, the SIP houses showed excellent performance. The SIP houses had blower door tested airtightness of 1.8 air changes per hour at -50 Pa compared to 3.9 for the conventional wood frame house. For each of the houses, a building audit was completed for the purpose of energy analysis for predicted peak heating and cooling load and annual energy consumption. With respect to the SIP houses, the frame house showed lower predicted annual space conditioning energy consumption but higher peak loads. The SIP houses had lower insulation values in the ceilings and walls than the frame house. However, the frame house had more window area and had its forced air ducts in the attic with a small amount of duct leakage to the outside. A home energy rating was also computed using REMRate. None of the houses met EPA/DOE Energy Star status primarily due to the uninsulated floor slab and electric resistance heat. Monitoring equipment for energy use and environmental conditions was installed but was not yet made operational due to lack of utility power at each house. We plan to monitor the houses from June 1998 through May 1999. Mechanical ventilation should be installed for wintertime operation, when the house is closed up, to provide adequate fresh air for the occupants. This could be accomplished using a high quality exhaust fan, meant for continuous duty, with an automatic timer and manual override. The houses currently do not have cooling systems. If it was intended to later install central, or window cooling equipment, a central-fan-integrated supply ventilation approach would be recommended instead of exhaust ventilation. Building Airtightness Testing Two structural insulated panel (SIP) houses and one conventional 2x4 wood frame house were tested by fan depressurization for airtightness of the building envelope and forced air distribution system (ducts). The houses were all single-story, slab-on-grade, and similar in size (average 1100 ft2). They were constructed by the Sumter County Habitat for Humanity Affiliate, with some assistance on the SIP houses from the Structural Insulated Panel Association. For the wood frame house, all construction and energy related details remained as standard practice for the Habitat Affiliate. Building envelope air leakage was measured by means of a Minneapolis Blower Door with digital pressure gauges. Table 1 lists the airtightness testing results and gives a short description of the construction. All of the houses tested had low building air leakage rates, which is good. Even so, the average building air leakage (EEBA Criteria) of the two SIP houses was still 31% lower than the building leakage of the standard wood frame house with the whole house fan sealed off.
Mechanical ventilation, other than standard bathroom exhaust, was not a design consideration, but it should be. Mechanical ventilation should be installed for wintertime operation, when the house is closed up, to provide adequate fresh air for the occupants. This could be accomplished using a high quality exhaust fan, meant for continuous duty, with an automatic timer and manual override. The fan could be installed as an upgrade to the existing bathroom fan, as long as the bathroom door was left at least partially open when the bathroom was not in use, or if other means were provided to allow air to flow from the central part of the house to the bathroom. The houses currently do not have cooling systems. If it was intended to later install central, or window cooling equipment, a central-fan-integrated supply ventilation approach would be recommended instead of exhaust ventilation. The central-fan-integrated supply ventilation approach involves a fresh air duct, routed from an exterior gable or soffit location to the central system fan return, and a specialized recycling control that functions to operate the fan for a selected ON time if it hasn't already operated for a selected OFF time. This ventilation approach can be installed for $125, and will also improve occupant comfort by making temperature and humidity conditions more uniform throughout the house. The wood frame house has a large attic fan mounted in the ceiling of the hallway. Since none of the Habitat houses in this area have cooling systems installed, the intent of this fan was improve comfort conditions during warm weather. The fan louvers are passively operated by pressure induced by the fan when it is operating. The louvers have no weather stripping and contribute a large part to the building envelope leakage. This was measured by taping off the attic fan. The house leakage rate at -50 Pa dropped 226 cfm (26%) with the attic fan taped off. It is recommended that the attic fan be sealed off when not in use, especially in cold weather. Using a smoke pencil with the house pressurized to 20 Pa, it was found that leakage through electrical boxes on outside walls was minimal. Penetrations through the wall top plates were sealed during construction. On the wood frame house, the foam exterior sheathing joints were taped, and the foam also tends to compress to the wall framing. Wall sill plates were caulked to the slab floor. The double-glazed, vinyl-frame, single-hung windows also showed low leakage. Table 1
* Whole house fan sealed off Measurement of natural air change rate under prevailing conditions was made by tracer gas decay. This testing was conducted in the eastern-most SIP house, then in the wood frame house. Table 2 lists the results. Both houses exhibited low air change rates even under breezy to windy conditions. However, since the houses were not heated, there was little stack effect due to indoor to outdoor temperature differential. Table 2
Forced Air Distribution System Airtightness Testing Duct system airtightness testing was conducted for each of the three houses using fan depressurization. Air flow was measured through an Energy Conservatory DuctBlaster®. Table 3 summarizes the results. All three houses had low, or no duct leakage to outdoors, which is excellent. A duct leakage criteria proposed by the Florida Solar Energy Center requires that duct leakage to outdoors be less than 3% of the conditioned floor area. All of the houses meet that criteria. For the SIP houses, all of the ducts are inside conditioned space. While for the wood frame house, the ducts are located in the attic, making the low duct leakage rate especially important.
Observations of the duct system were as follows:
Table 3
For each of the houses, a building audit was completed for the purpose of energy analysis for predicted peak heating and cooling load and annual energy consumption. This information is given in Table 4. With respect to the SIP houses, the frame house showed lower annual space conditioning energy consumption but higher peak loads. The SIP houses had lower insulation values in the ceilings and walls than the frame house. However, the frame house had more window area and had its forced air ducts in the attic with a small amount of duct leakage to the outside. Table 4
A home energy rating was also computed using REMRate created by Architectural Energy Corporation in Boulder, Colorado, which is intended to follow the guidelines published by the Home Energy Rating Systems Council in Washington, D.C. The reference house always scores an 80. The EPA/DOE Energy Star program labels a house as Energy Star compliant if the rated house scores 86 or above. The rated house has the equivalent of five percent better energy performance than the reference house for every point above 80 and five percent lower energy performance for every point below 80. As shown in Table 5 the ratings for all of the houses was 83. None of the houses made Energy Star status primarily due to the use of electric resistance heat and the uninsulated concrete slab floor. Table 5
Monitoring Sensors and dataloggers were installed in all three houses for long-term monitoring of energy use and indoor environmental conditions. Measurement points for the all-electric houses are:
The houses are side-by-side and a weather station was installed on a southern exposure of the center SIP house. Outdoor environment measurement points are:
The houses did not have electrical power at the time of monitoring equipment installation. Therefore, the sensors and dataloggers were installed but not yet made operational. We plan to monitor the houses from June 1998 through May 1999. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||